Agilia® self-compacting concrete was used on the pedestrian bridge at Kifissias Avenue in Filothei. The bridge consists of two pillars that enclose the elevator shafts, platform, staircases as well as ramps for disabled access.
The new Tithorea - Lianokladi - Domokos High Speed Railway Line is a new double rail line, 106 km long, which replaces the difficult mountainous part of the existing single rail line.
In a total area of 28,000 square meters, the Municipal Sports and Recreation Park of Kallithea includes a football field, an Olympic-size outdoor swimming pool, a children’s swimming pool, auxiliary facilities, as well as recreation and event areas.