Infrastructure

The New Waterfront of Thessaloniki is a five-kilometre beachfront, delivered to the citizens of Thessaloniki in December 2013 after 2.5 years.

Another major project, amounting to € 150 million, started with our contribution with the aim to upgrade Coastal Athens.

 

The Trans-Anatolian Gas Pipeline “TANAP” transports natural gas from Azerbaijan to Europe via Georgia and Turkey. 

The Great Tempi Tunnel was recently completed with HERACLES Group’s seal of approval, consisting a breath of fresh air for the Greek highways.

With the contribution of Lafarge’s over 7,000 m3 of highly durable concrete for coastal environments, the new Airport became a reality.

Agilia® self-compacting concrete was used on the pedestrian bridge at Kifissias Avenue in Filothei. The bridge consists of two pillars that enclose the elevator shafts, platform, staircases as well as ramps for disabled access.

The new Tithorea - Lianokladi - Domokos High Speed Railway Line is a new double rail line, 106 km long, which replaces the difficult mountainous part of the existing single rail line.

We contributed to the construction of the largest - under construction - building project in Greece for 2017.

Aposelemi Dam is located about 35 km east of Heraklion, Crete.

In a total area of 28,000 square meters, the Municipal Sports and Recreation Park of Kallithea includes a football field, an Olympic-size outdoor swimming pool, a children’s swimming pool, auxiliary facilities, as well as recreation and event areas.

The building that houses the 6th and 44th Primary Schools at Heraklion in Crete is one of the oldest and most historic schools in the city centre.